Case Study #4: MacAlpine Lewisham (Construction)
This was an exceptionally difficult site with
a stream running through the stand of Knotweed. With careful
supervision it was removed without the need to dam the stream
or overpump. Further costs were saved by burying the excavated
material on site. The whole operation took 1 and a half days. |