Case Study #4: MacAlpine Lewisham (Construction)

This was an exceptionally difficult site with a stream running through the stand of Knotweed. With careful supervision it was removed without the need to dam the stream or overpump. Further costs were saved by burying the excavated material on site. The whole operation took 1 and a half days.